Case Studies

Amber 81 Film Makes Outdoors Safe for Student with Photosensitivity Condition

Dumfries, Scotland

Project Summary:
Project: School Outdoor Shelter
Location:  Dumfries, Scotland
Installer: ARC Window Films
Film Type: Amber 81
Scope: 21 windows
Date: March 2014

Healthcare Real Estate Firm Improves the Look and Energy Consumption of Medical Buildings with Sun-Gard Optivision®

Atlanta Metro Area, Georgia

Project Summary:
Project: Medical Buildings  
Location: Atlanta Metro Area, Georgia
Installer: Suntamers
Film Type: Optivision 15 & 25
Date: April 2013
Scope: 3 buildings, 20,000 total sq. ft.

Sun-Gard Nova 70 Protects English Wine Shop’s Fine Wines from Damage Due to Overheating

Village of Whalley in Lancashire, England

Project Summary:
Project: Whalley Wine Shop
Location: Village of Whalley in Lancashire, England
Installer: ARC Window Films
Film Type: Nova 70
Date: April 2013
Scope: All storefront windows

Charlotte Motor Speedway

Charlotte, NC

Project Summary:
Project: Charlotte Motor Speedway
Location: Charlotte, NC
Installer: All Pro Window Tinting
Film Type: Sunscape Purelite 60
Date: October 2012
Scope: 24 windows, 1,272 sq. ft.

Ellis Building

Sarasota, FL

Project Summary:
Installer: Sarasota Window Tint, Kirk Davis Window Tint, Tint & Wrap, and Film Application Specialist
Type of Film: Exterior Solar Grey 20 3 Mil
Installation Date: March 2010
Window Area Covered: 38,000…

Read More

John Hancock Tower

Boston, MA

Project Summary:
Installer: Sonny’s Glass Tinting
Type of Film:  Clear 4 Mil (CL 400 PS SR)
Installation Date: 1986
Windows Covered: 10,334
Performance Evaluation Performed: 2009

Lynx Building

Orlando, Florida

Project Summary:
Installer: Glass Protection Services
Type of Film: 8 mil Silver 40 (RS 440)
(wet glaze attachment)
Installation Date: March, 2010
Installation Time: 2 months
Window Area Covered: 15,000 ft2
Payback Period: 2 years

Safeco Building

Seattle, Washington

Project Summary:
Installer: Mr. Tint & Sun
Type of Film: Silver 30 (SRS 330) Solar Film
Installation Date: 1996
Competitor’s Film Replaced: Yes
Window Area Covered: 106,000 ft2
Annual Savings: ~$200,000

Reunion Park

Austin, Texas

Project Summary:
Installer: Lime Energy
Type of Film: Silver 20 (SRS 220) Solar Film
Installation Date: December 2009
Installation Time: 2 weeks
Windows Covered: 524
Payback Period: 2 years